General Data
Name: Caño.
Owning company: EDP.
Supply reservoir: Sella.
Began operations: 1928.
Physical features
Usable volume of the reservoir (Hm³): Flowing.
Turbine type: G1 semi-Kaplan and G2 Francis.
Energy features
Installed capacity (MW): Pending - new concession
Energy produced in average year: 3.6 GWh.
Number of groups: 2.
Maximum flow of equipment: 9 m³/s.